Skip to main content

TechPark Logistics Center

150,000 sq ft commercial TPO retrofit

Industry: commercial

Timeline: [REPRESENTATIVE — NOT YET SOURCED]

[REPRESENTATIVE — NOT YET SOURCED]

This case study is a placeholder pulled from the Figma design reference. Replace with confirmed Pro Exteriors project data — actual project name, completion date, square footage, measured outcomes, and authorized photography — before production launch. The page-qc gate will block ship if this marker remains.

A 150,000 square foot TPO retrofit on an active 24/7 distribution center. Phased install during off-hours preserved shipping operations through the full project window. Reduced annual cooling costs by 22% in the first post-install season; ROI projected at 3.5 years on the energy savings alone.

Size: 150K SQ FT · ROI: 3.5 years