Industry: commercial
Timeline: [REPRESENTATIVE — NOT YET SOURCED]
[REPRESENTATIVE — NOT YET SOURCED]
This case study is a placeholder pulled from the Figma design reference. Replace with confirmed Pro Exteriors project data — actual project name, completion date, square footage, measured outcomes, and authorized photography — before production launch. The page-qc gate will block ship if this marker remains.
A 150,000 square foot TPO retrofit on an active 24/7 distribution center. Phased install during off-hours preserved shipping operations through the full project window. Reduced annual cooling costs by 22% in the first post-install season; ROI projected at 3.5 years on the energy savings alone.
Size: 150K SQ FT · ROI: 3.5 years